Step 7 5.5 sinumerik solution line6/28/2023 ![]() ![]() Infrastructureīuilt with local funds, the 16-stop 1,435mm gauge line featuring street running is 7.5 miles (12km) long from Houston University (‘U-H Downtown’) via the city centre including ‘Downtown Transit Center’ to Fannin South park-and-ride terminal. Covering also their bus and heavy rail operations, Metro’s planning for 30 miles of light rail in the area is expressed via the ‘Metro Solutions’ identity. ![]() Preliminary engineering on the $324m project began in January 2000 and construction started in 2001.ĭelivered as a turnkey project by Siemens, the project for the Red Line opened according to schedule in January 2004. The major investment study for urban transport was completed in August 1999 and Metro Board unanimously selected light rail alternative in September of the same year. “By 2007, MetroRail had welcomed its 40 millionth passenger and was attaining a daily ridership of 45,000.” ![]()